Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Aug 24, 2020     6W6,6W7 - Attaching Rear Ribs on left wing main spar - (5 hours)       Category: Wings
Roger got back to me by 7am. Wow, good service. Anyways, he answered "Yes you will have to trim rib #1 to clear the spar cap. I will let Zenair know the issues." At this time is when i noticed the cutout detail in the plans (doh), it says ribs 1-6 (which i really didn't notice before).

Therefore I spent the afternoon/evening trimming all of the offending ribs (for both wings). Then I drilled and cleco'd them all in place. Ribs 1 and 3 had a plate on the front side of the spar thus forcing me to fit-draw for drill on the rib first instead of drilling in place from the front of the spar.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.